Projects

 
Fire Detection & Alarm System

Fire Detection & Alarm System

NFPA regulations provide requirements for the installation, performance, testing, inspection, and maintenance of the fire alarm system. Regulation also covers wiring of a fire alarm system. NFPA 72, National Fire Alarm and Signalling Code covers the requirements for installation performance  of fire alarm systems. System requires visible signalling if the ambient sound pressure level is above 105 dBA.

NFPA 72 addresses several means of transmitting alarm and other signals from a fire alarm system at a protected premise to a supervising station. The most widely used means is a digital alarm communicator system.

These systems use a digital alarm communicator transmitter (DACT) connected through two transmission channels.

The Code requires the primary channel to be a telephone line. The secondary channel can be a second telephone line, or one of 6 other transmission means

Fire Fighting & Protection System

Fire Fighting & Protection System

Fire protection within a structure is a system that relies on all of its components. The building is designed in compliance with the latest QCS and QCDD regulations by the architect and consultants. Firefighting system comprises of sprinklers, fire extinguishers and various panels interfaced with electrical and ventilation system that need to be shut down during a fire situation. Benchmark carries out supply and installation of firefighting and protection system depending on the requirement of the main contractor/client with high quality technical skills and expertise.

Central Air Conditioning & Ventillation System

Central Air Conditioning & Ventillation System

Benchmark specializes in design, supply, install, test and commissioning of central air conditioning systems to suit the commercial and residential building as per local and international codes and practices.

Our list of projects includes

  • Residential,
  • Commercial,
  • Worship places,

and type of installation varies from

  • Central DX system,
    To central chilled water system to suit the client requirements.
  • Our core idea of providing the most economical and long lasting system to client has given us the identity of being professional and expertise identity in the local market.

We also supply and install the fire safety ventilation system related pipeline work for high rises and car park as per local QCDD standards as part of HVAC installation or independent ventilation system for residential building as per local codes and standards.

 

 

 

 

Electrical Installation

Electrical Installation

Benchmark executes electrical work in a residential, commercial and industrial setting, with widely varying hours and working conditions, depending on the main contractor/client/employer and their specific job description. We focus on either constructions and/or maintenance. Once engaged to contract works.

Our responsibilities include:

  • Different tasks, in areas that include customer service and administrative work, installation and maintenance. Benchmark executes electrical work in a residential, commercial and industrial setting, with widely varying hours and working conditions, depending on the main contractor/client/employer and their specific job description. We focus on either constructions and/or maintenance.

Once engaged to contract works,  our responsibilities include:

  • Different tasks, in areas that include customer service and administrative work, installation and maintenance.

Customer service and administrative work often includes:

  • contacting customers,
  • scheduling appointments and completing regulatory requirements, such as KAHRAMAA permit applications
  • and periodic coordination with KAHRAMAA during the course of execution of new project that facilitate to KAHRAMAA planning, installation & consumer sections inspections and transmission cable laying and Kw/hr meter fixing and finally energizing of new premises.
  • Our successfully completed works warranty 365 – 400 days against faulty materials and bad workmanship

Construction duties include:

  • surface and/or concealed bending conduit,
  • laying conduits and its accessories,
  • stringing wires,
  • fixing distribution boards;
  • dressing the cables
  • and fixing miniature circuit breakers within,
  • fixing of Sub-Mains and Main switchboard,
  • fixing cable trunk and trays,
  • fixing over ground and laying underground cables,
  • fixing final accessories such as switches & sockets,
  • lighting fixtures and chandeliers and machineries.
  • Testing, measuring and finally energizing premises with KAHRAMAA engineering team.

Maintenance duties include:

  • inspecting electrical equipment,
  • replacing worn parts and repairing complex devices.
  • Electrical Code: KAHRAMAA has a code of practice which is strictly based on knowledge of codes and regulations and passing an examination.
  • KAHRAMAA requires contractor’s engineers and supervisors successfully completed test conducted by URBAN PLANNING & DEVELOPMENT AUTHORITY (UPDA). To become a qualified electrical contractors generally
FIRE DETECTION AND FIRE FIGHTING SYSTEMS

FIRE DETECTION AND FIRE FIGHTING SYSTEMS

 

Fire Alarm System

SEIMENS / USA (UL/FM Approved)

SIMPLEX / USA (UL/FM Approved)

Fire Pumps

PATTERSON/USA (UL/FM APPROVED)

SFFECO/UAE (UL Approved)

Fire Extinguishers and other fire fighting equipment

SRI / MALAYSIA

CCTV AND PA SYSTEM

CCTV AND PA SYSTEM

Various ranges of highly stable and quality products to satisfy the market are available at Benchmark Trading with advanced technology based on customer’s requirements and prompt response.

Access Control System

PROGENY/UK

Video Surveillance System

VICON/UK

Building Management System

TREND/UK

Public Address System

TOA /TAIWAN

PLUMBING & DRAIN OUTLETS

PLUMBING & DRAIN OUTLETS

Copper Pipes and Fittings

IMI YORKSHIRE/UK MUELLER/USA

Floor Drains and Floor cleanouts

DALLMER/GERMANY

Roof Drains-

ZURN/USA

Balcony Drains-

HAMADA/JAPAN

Plumbing, Main and Fire water application, Air conditioning and Regulator valves-

PEGLER/UK

PVC pipes and Fittings-

RAK THERM/UAE

Pex pipes and Fittings-

RAK THERM/UAE

PRV and Expansion joints-

DANFOSS SOCLA/FRANCE

Vulchathelene pipes and fittings-

DURAPIPE/UK

Acid Waste Drainage-

DURAPIPE/UK

Garbage and Debris chute system-

OSTERMEIER/UAE

Hand Dryer and Washroom Equipment-

MEDICLINICS/SPAIN

Residential Electric water heaters-

PACIFIC/FRANCE

Commercial Electric heaters-

ATLANTIC/FRANCE

LIGHT FITTINGS

LIGHT FITTINGS

Indoor Lighting

DISANO / FOSONOVA/ITALY

LUDWIG / GERMANY

ATENALUX / ITALY

Outdoor Lighting

IEP ILLUMINacion / SPAIN

Recessed Down Lighting

ARKOS / OSCALUZ-SPAIN

Emergency Lights

iTECH & ONTEC

Aluminium Columns

NEDAL ALUMINIUM / NETHERLAND

Ground Light with S Steel Housing

WEBER / GERMANY

Sports Ground Lighting

FAELLUCE / ITALY

Construction Of Masjid & Imam House Type DM5, DM6, M116A, M112A & FM8 From Awqaf & Ashghal

Project Name: Construction Of Masjid & Imam House Type DM5, DM6, M116A, M112A & FM8 From Awqaf & Ashghal
Consultant: Ministry Of Endowment And Islamic Affairs (AWQAF)
End User: Ministry Of Endowment And Islamic Affairs (AWQAF)
Main Contractor: Narm Trading & Contracting
Details: Electrical Installation
Project Status: From 2006 Till Date
41 Villas + Club House For Ska Ayesha Bint Naseer Al Thani At Al Waab

Project Name: 41 Villas + Club House For Ska Ayesha Bint Naseer Al Thani At Al Waab
Consultant: White Young And Partners
End User: Sh. Fahad Bin Jassim Al Thani
Main Contractor: Complete Electrical Installation Including Transformer And MV Panel
Details: Electrical Installation
Project Status: Completed In 2006